MGA Thermal and Knode begin FEED study for 195 MWh thermal storage at Tronox
An ARENA-backed A$2.9M FEED study covers a 195 MWh system to supply about 20 t/h of steam to Tronox in Kwinana under Heat-as-a-Service; construction is slated for 2027 and operation for 2028.