TES Landscape
Hot TES · Hot Storage · 2026-11-20

Caldera

UK industrial thermal battery developer building Warmstone Storage Boilers out of recycled aluminum and volcanic rock to convert variable electricity into industrial steam above 200°C.

Headquarters
United Kingdom (Europe)
Founded
2017
Storage Medium
Recycled aluminum & volcanic rock composite (Warmstone Storage Boiler)
Temperature Band
100°C to 500°C
Technology Readiness
TRL 7 / 9 (FOAK)
Outputs
steam, process-heat
Maturity Gauge

TRL 7 of 9

Growth stage: FOAK · Ownership: Startup

Capital & Backing

Strategic equity (GEA EUR 12M stake, March 2025) + UK government grants

Cumulative funding undisclosed or mature/subsidiary structure.

Backers: GEA Group

Grants / Public Programs: UK Industrial Fuel Switching Competition (GBP 4.3M)

Flagship Projects & Deployments

ProjectLocationCapacityStatusYear / Source
Full-Scale Industrial Storage Boiler Demonstrator Hampshire, United Kingdom 5 MWh(th), steam above 200°C Operational 2026 · enlit.world

Latest Milestones

2026-06 · enlit.world

UK energy minister switches on Caldera's 5 MWh industrial heat battery

Lord Whitehead switched on the giant heat battery at Caldera's manufacturing facility; it stores up to 5 MWh and delivers steam above 200°C for industrial users.

2025-03 · gea.com

GEA invests EUR 12M in Caldera

German process-engineering group GEA took a stake in the Hampshire-based heat storage company to scale deployment of its electric storage boilers.