TES 市场格局
Hot TES · 高温 储能 · 2026-11-20

EnergyNest

Norwegian TES pioneer commercializing modular ThermalBattery concrete elements (HEATCRETE) that store electric or waste heat up to 400°C to deliver continuous industrial steam for chemicals, food, and manufacturing.

总部
Norway (Europe)
成立年份
2011
储热介质
Proprietary high-conductivity concrete modules (HEATCRETE ThermalBattery)
工作温区
150°C to 400°C
技术成熟度 (TRL)
TRL 9 / 9 (Commercial)
输出形式
steam, process-heat
成熟度指标

TRL 9 / 9

成长阶段: Commercial · 企业性质: 初创企业

资本 & 投资背景

Growth equity (Infracapital, EUR 110M, April 2021)

已披露累计融资: ~$130M USD.

投资方: Infracapital

资助 / 公共项目: EU Innovation Fund

旗舰项目 & 落地部署

项目地点容量状态年份 / 来源
Yara Porsgrunn Steam Grid ThermalBattery Porsgrunn, Norway 4 MWh(th) Operational 2023 · solarthermalworld.org
Avery Dennison ThermalBattery Belgium 5 MWh(th) Operational 2023 · solarthermalworld.org
LEONHARD KURZ Power-to-Heat with ThermalBattery Sulzbach-Rosenberg, Germany 12 MWh(th) / 3 MW(e) heater Operational 2026 · kurz-world.com

最新里程碑

2026-09 · kurz-world.com

LEONHARD KURZ and ENERGYNEST commission power-to-heat plant with heat storage

A 3 MW electric heater and 12 MWh(th) ThermalBattery at KURZ's Sulzbach-Rosenberg site completed installation and commissioning and now supply industrial process heat.