TES 市场格局
CSP + TES · 高温 储能 · 2026-11-20

Cosin Solar

Hangzhou-based tower CSP and molten-salt thermal energy storage supplier (formerly SUPCON Solar) whose 50 MW Delingha plant was among China's first CSP demonstration projects; it is developing the 350 MW Golmud single-unit tower plant and supplies solar fields and salt storage to other Chinese CSP bases.

总部
China (Asia-Pacific)
成立年份
2010
储热介质
Concentrated solar power tower + two-tank molten nitrate salt (565°C)
工作温区
290°C to 565°C
技术成熟度 (TRL)
TRL 9 / 9 (Mature)
输出形式
electricity, steam
成熟度指标

TRL 9 / 9

成长阶段: Mature · 企业性质: 成熟非上市企业

资本 & 投资背景

Private (formerly Zhejiang SUPCON Solar, renamed 2021)

累计融资未披露,或属成熟私企/子公司结构。

投资方: Chinese clean-energy institutional investors

旗舰项目 & 落地部署

项目地点容量状态年份 / 来源
Delingha 50 MW Tower CSP Plant (7-Hour Molten Salt TES) Delingha, Qinghai, China 50 MW(e), 7 hr molten salt storage Operational 2019 · blog.kowatek.com
Golmud 350 MW Single-Unit Tower CSP Plant Golmud, Qinghai, China 350 MW(e), three receiver towers with molten salt TES Under Construction 2027 · news.cgtn.com
Fukang 100 MW Molten Salt Tower CSP (solar field and TES supplier) Fukang, Xinjiang, China 100 MW(e), 8 hr molten salt storage Commissioning 2026 · blackridgeresearch.com

最新里程碑

2026-11 · blackridgeresearch.com

Fukang 100 MW molten-salt tower CSP plant with Cosin solar field and storage enters trial operation

The Xinjiang plant, with 8 hours of molten-salt storage, connected to the grid as part of Fukang's 1 GW multi-energy base.

2025-10 · news.cgtn.com

Broke ground on 350 MW Golmud tower CSP plant, the world's largest single-unit CSP facility

The roughly 5.44 billion yuan project uses three receiver towers feeding one turbine and targets full grid connection by end of September 2027.

2025-10 · blog.kowatek.com

Won inaugural SolarPACES Implementation Award for Delingha 50 MW CSP plant

The award recognized the plant's long-term stable operation above design generation since 2019 with 7 hours of molten salt storage.