TES Landscape
CSP + TES · Hot Storage · 2026-11-20

Vast Renewables (Vast Energy)

Australian developer of modular CSP using liquid sodium receivers with 8+ hours of molten-salt storage. Entered voluntary administration in November 2025 and moved to a deed of company arrangement (DOCA) in February 2026.

Punong-tanggapan
Australia (Asia-Pacific)
Itinatag
2009
Storage Medium
Modular CSP v3.0 with liquid sodium heat-transfer loop + molten salt TES
Saklaw ng Temperatura
290°C to 565°C
Technology Readiness (TRL)
TRL 7 / 9 (Restructuring)
Mga Output
electricity, process-heat
Sukatan ng Kahandaan

TRL 7 sa 9

Yugto ng paglago: Restructuring · Pagmamay-ari: Hindi aktibo / nasa administrasyon

Kapital at Suporta

Administration, then DOCA (Feb 2026)

Hindi inihayag ang kabuuang pondo o matatag/subsidiary na istruktura.

Mga Tagasuporta: Nabors Industries, AgCentral Energy

Mga Grant / Pampublikong Programa: ARENA AUD $180M conditional (Mar 2025, restructured)

Mga Flagship Project at Deployment

ProyektoLokasyonKapasidadKatayuanTaon / Sanggunian
Vast Solar 1 (VS1) Port Augusta Port Augusta, South Australia 30 MW(e) / 288 MWh(e) (8+ hr TES) Restructuring / Stalled 2026 · kpmg.com

Pinakabagong mga Milestone

2026-09 · assets.kpmg.com

Administrators proposed selling VSA shares to 1414 Degrees

A proposed DOCA variation would let the sale proceed, with proceeds going to the deed fund.

2026-02 · esdnews.com.au

Creditors moved Vast to a DOCA transferring core IP to ARENA

ARENA holds about 45% of the debt. Unsecured creditors were estimated to recover 3.2c to 4.2c on the dollar.